ECCUK were appointed to deliver a full commercial EV charging solution at Alto Works Road, Letchworth Garden City, Hertfordshire, following an internal Ask the Team survey that highlighted the growing need for workplace EV charging facilities. With increasing numbers of electric and hybrid vehicles on-site, the client required a future-proof, reliable charging infrastructure that could be installed with minimal disruption to an extremely busy car park.

Scope of Works

The ECCUK team designed and installed a complete commercial charging setup featuring:

Three 22kW Easee EV chargers mounted within the on-site car park

Power supply taken directly from the main building source

A new feeder pillar and distribution board installed within the car park

Over 50 metres of groundworks, including trenching and reinstatement of block paving.

Thermoplastic EV Bay markings for clarity, safety, and compliance

Integration with the Easee Back Office system, utilising RFID access control

The whole Installation was completed over three consecutive weekends to minimise operational impact. This approach ensured a neat, durable installation designed to scale with future demand.

Technical Delivery

To support the new chargers, we diverted power from the main electrical intake and routed it to a purpose-built feeder pillar positioned within the car park. Our engineers installed a robust armoured cable along the 50-metre route, completing all trenching, ducting, and reinstatement with precision so the car park returned to its original condition. Once power infrastructure was in place, the team mounted and commissioned the three Easee 22kW chargers, chosen by the client for their flexibility, smart-charging capabilities, and compatibility with commercial back-office systems. The phased weekend installation strategy allowed the facility to remain fully operational Monday to Friday, significantly reducing disruption for staff and visitors.

Back Office & Future Scalability

The client opted to begin with the Easee Back Office platform, using RFID cards for controlled access and energy monitoring. With EV usage expected to increase, the client has also expressed interest in transitioning to a pay-to-charge operator model in the future— a seamless upgrade supported by the Easee system’s open architecture.

Results

Fully operational commercial charging system

Future-ready infrastructure capable of supporting additional chargers Minimal disruption due to weekend-only work schedule

Improved sustainability credentials for the site

Enhanced convenience for EV-driving employees and visitors

Client Feedback

Altro Facilities Manager Terry Dear provided outstanding feedback regarding the delivery and professionalism of our team stating:

“I would like to thank you and your guys for the work you completed this weekend. I was impressed with the attitude of the guys as well as the effort and attention to detail on the finish they showed. I appreciate the dedication shown by everyone.”

Conclusion

This project demonstrates ECCUK’s ability to deliver high-quality commercial EV charging installations with smart planning, minimal disruption, and long-term scalability. By combining robust power infrastructure, premium charging hardware, and flexible back-office solutions, we provided a charging system ready to support the client’s evolving sustainability and mobility goals.

Related works

Commercial EV Charger Installation - Newmarket Hospital – Multi-Location Public Sector EV Charging Project

The brief was clear: install scalable, revenue-capable commercial EV charging points across four separate locations within a live public sector estate, incorporating integrated pay-to-charge functionality and centralised back-end management.

Prince Albert Community Trust – Multi-Site EV Charge Point Installation Across Birmingham

Installing EV charging infrastructure across multiple live school sites

Saint Francis of Assisi School

Saint Francis of Assisi Catholic College is a mixed Roman Catholic secondary school in Walsall, England. It was previously known as St Francis of Assisi RC School, until it was renamed St Francis of Assisi Catholic Technology College in September 2003 after gaining specialist status as a Technology College. The school has approximately 1,100 pupils on roll of which around 110 attend the sixth form

Let’s talk!

If you have any questions about our services and solutions or just want to get an idea on where to start. Either give us a call or complete the short form and we will be in touch to assist in any way we can with your EV charger needs.

012 1661 7969
Electric Chargers UK, EV chargers
Contact Us - Standard
Please Enter
Please Enter
Please Enter
Please Enter
Please Enter

Recent Posts

We are EV charging experts

Keep on top of the latest

Enter your email address to follow this blog and receive notifications of new posts by email

Subscription