Commercial EV Charger Installation for UK Businesses
Scalable, fully managed EV charging infrastructure for workplaces, fleets and public sector organisations across the UK.
Scalable, fully managed EV charging infrastructure for workplaces, fleets and public sector organisations across the UK.
ECC UK is a commercial EV charger installation company. We are OZEV authorised, our engineers are our own, and we design, install and maintain commercial EV charging for workplaces and business car parks, fleets and depots, hotels, schools, colleges and academies, car dealerships and councils and public sites across England and Wales. This page covers what commercial EV charger installation costs in 2026, which grants are open, how many charge points you need, how the installation runs and how to choose an installer.
If you are responsible for a workplace car park, a depot, a fleet or a site your customers park at, you have probably worked out that installing EV charging is not the simple job it looks like from outside. The equipment is the easy part. What decides the cost, the timescale and whether the project works at all is your site: how much spare electrical capacity you have, how far the cable has to run, and what the grid operator says when you ask.
There is no honest single price, and anyone quoting one before seeing your site is guessing. The equipment is a minority of the bill on most commercial projects. The cost is driven by four things:
To get a realistic figure before you commit to anything, use our cost estimator, which asks about your site rather than guessing, or book a free survey and we will give you an exact number for your site.
Book a free site survey
Most commercial projects qualify for something. These are the schemes that are open, and they are funded to 31 March 2027:
Three schemes closed to new applications on 31 March 2026: the EV Infrastructure Grant for staff and fleets, the Commercial Landlord Chargepoint Grant and the Landlord Infrastructure Grant. If you are still being quoted the old, much larger headline figures elsewhere, those pages have not been updated. We would rather tell you what is real than quote a number that no longer exists.
The paperwork is tedious and the eligibility rules are specific, which is why we validate and process the claim as part of the job rather than leaving it with you. Check what your site qualifies for with our 2026 grants guide.
Check your grant eligibility
The common mistake is buying for today’s EV count. The second most common is buying for a future that never arrives. The number you want depends on three things, and none of them is how many electric cars your staff drive right now:
If you do not have enough capacity today, that is common and it is not the end of the project. Smart load management shares your existing supply across charge points and avoids an upgrade on a large proportion of sites. Where an upgrade genuinely is needed, we handle the DNO application.
Try the cost estimator
A standard workplace installation is days on site, not weeks. Where your supply needs upgrading, or the scheme is a large one, two to three weeks is the realistic maximum for our part of it. A DNO’s own lead time sits on top of that and is set by them, not by us, which is the single best reason to survey early rather than late.
Six things worth checking before you appoint anyone, ourselves included. They are the questions that separate a project that lands on time from one that stalls halfway. Most commercial EV charger installers will answer yes to two or three of them. Rather fewer answer yes to all six.
We work across England and Wales as standard, with engineers based in the West Midlands, and we will travel further for larger multi site projects.
Rather than list sectors, here are named projects you can read in full: Prince Albert Community Trust, a multi site charge point installation across Birmingham schools; Newmarket Hospital, a multi location public sector project; Pladis McVitie’s, manufacturing site charging; Norwich City Council; and Castle Howard Hotel, hospitality and visitor charging.
Call 0121 661 7969, Monday to Friday 08:30 to 16:30, or book a free site survey below.
For a typical workplace with spare capacity, a bank of 7kW or 22kW sockets is a job measured in days and the equipment is a minority of the bill. Cable runs, groundwork and any supply upgrade are what move the price. Use the cost estimator for a site specific figure, or read our 2026 cost guide.
In most cases, yes. The Workplace Charging Scheme pays £500 per socket on up to 40 sockets, and £2,000 per socket for state funded schools, and is funded to 31 March 2027. We check eligibility and process the claim as part of the installation. See our Workplace Charging Scheme 2026 guide.
Often not. Smart load management shares your existing supply across the charge points and avoids an upgrade on a large proportion of sites. Where an upgrade is needed, we handle the DNO application for you.
Days on site for a standard workplace. Two to three weeks for a large scheme or one that needs a supply upgrade, plus the DNO’s own lead time where one applies. A free site survey is confirmed within one working day.
England and Wales as standard, from our West Midlands base. That includes Birmingham, the Black Country, Coventry, Worcester and the wider Midlands, and we travel further for multi site projects.
We specify the charge point to the job rather than selling one brand: 7kW and 22kW units for staff and long dwell parking, and rapid chargers for fleets, dealerships and public sites, all running on an OCPP compliant management platform so multi site estates are monitored from one system.
Book a free site survey and we will tell you what your site can support, what it will cost and what grant it qualifies for.
Book a free site surveyIf you have any questions about our services and solutions or just want to get an idea on where to start. Either give us a call or complete the short form and we will be in touch to assist in any way we can with your EV charger needs.
0121 661 7969
Free, no obligation, and we will confirm your survey within one working day.
Book a Free SurveyEnter your email address to follow this blog and receive notifications of new posts by email