ECC UK designs and installs charging for van, car and depot fleets, from a handful of drivers who take vehicles home to full depot rollouts. We size the power, manage the load and keep the chargers running after handover.
Window 2 of the government’s Depot Charging Scheme is now open. It opened on 11 November 2026 and closes at midday on 26 February 2027, with £38m available at 60% of eligible charger and civil costs, up to £1m per organisation. Applications are assessed first come, first served, and projects must be delivered between April 2027 and 31 March 2028. Talk to us now and we will get your quote and technical detail ready so you can apply quickly. If you run electric vans, HGVs or coaches from a depot, this is the funding route that carries on after the other chargepoint grants end in March.
Not running from a depot, or your drivers charge at home? Book a free fleet site survey.
What we install
- Depot charging for vans and pool cars, with 7kW to 22kW AC chargers for overnight charging.
- Rapid DC charging for vehicles that need a quick top up between shifts or routes.
- Home charging for drivers who take vehicles home overnight.
- Workplace charging for company car and salary sacrifice drivers.
Load management comes first
Most depots don’t have the spare grid capacity for every vehicle to charge at full power at once. We survey your supply, then use smart load management so chargers share the available power and every vehicle is ready for the morning.
Where a supply upgrade is needed, we scope it with your network operator early so it doesn’t hold up your fleet changeover.
How a fleet project runs
- Site survey and supply check. We look at your parking layout, vehicle duty cycles and available power.
- Design and quote. Charger numbers and power, cable routes, any groundworks, and a fixed price.
- Installation and commissioning. Phased around your operation so vehicles keep moving.
- Back office and reporting. Driver access, RFID cards and usage by vehicle or driver.
- Aftercare. Bespoke maintenance plans and repair callouts through our EV charger maintenance team.
Depot Charging Scheme: what it pays for
- Up to £1m per organisation, across as many depots as you like
- Window 2 pays 60% of eligible costs, down from 70% in window 1. Rates are expected to keep falling in later windows, so earlier projects get the most
- Chargers of any type or speed, civils, cabling and electrical works inside the depot
- Battery storage built into the charging system, and solar PV that only feeds the chargers
Not covered: the vehicles themselves and grid connection upgrades. That is why we design load management in from the start.
Who qualifies for the Depot Charging Scheme
- You run, or will run, at least one battery electric van, HGV or coach
- You own or lease the depot
- Your organisation has operated in the UK for at least a year
- A senior leader signs off the application
- The chargers are mainly for your commercial vehicles
Private fleets, councils, public bodies and charities can all apply.
Applying for the Depot Charging Scheme with ECC UK
- Tell us about your depot. Two minutes on the form below. Window 2 is open now and closes at midday on 26 February 2027.
- Desktop readiness check. We size your charging from your fleet data and supply details, at no cost.
- Site survey and grant ready quote. Itemised to drop straight into the DfT application workbook.
- You apply. We supply the quote and technical detail your application needs.
- We install. Once your Grant Funding Agreement is signed, from April 2027.
No money can be spent before the Grant Funding Agreement is signed, so the planning needs to happen now. Applications are first come, first served, or competitive if the window is oversubscribed, so getting a quote and supply evidence together early is what gets projects funded. Further windows are expected for 2028/29 and 2029/30, with dates and rates to be confirmed in 2027.
The application and our commitment agreement
You apply directly to the Department for Transport using their application form, workbook and letter of intent. See the scheme and application documents on GOV.UK.
Our survey and design are free. In return we ask private sector customers to sign a one page Survey Commitment Agreement: if your grant is approved, you appoint ECC for the works. If the grant is refused, you owe nothing. Read the Survey Commitment Agreement (PDF).
Councils, NHS trusts and schools usually can’t commit to a supplier before procurement, so for public sector customers we offer a fixed survey and design package instead: £999 plus VAT for the first depot and £499 plus VAT for each additional depot. You get a survey of each depot, an outline charger layout and an itemised cost schedule ready for the DfT workbook, and the full amount is credited against your order if we carry out the works.
Funding after March 2027
The Depot Charging Scheme above funds depot projects delivered from April 2027 to March 2028. The Workplace Charging Scheme closes on 31 March 2027. If you want to use the grant before then, see our WCS deadline guide.
After that, fleet charging pays for itself on running costs: electricity per mile costs far less than diesel, and company car tax for electric vehicles stays well below petrol and diesel. Ask your accountant which capital allowances apply. Our payback calculator gives a quick estimate.
Why fleets work with ECC UK
- OZEV authorised and NAPIT registered installer.
- Multi site delivery across England and Wales, with offices in London and Wolverhampton.
- Experience with NHS trusts, councils, schools and corporate sites.
- One team from survey to aftercare.
Trusted by NHS trusts, councils and corporates





Looking for workplace or visitor charging as well? See commercial EV charger installation.
Get your application ready
Tell us about your fleet and depot. We’ll come back within two working days with the next step. Window 2 closes at midday on 26 February 2027.
Frequently asked questions
Can we also use the Workplace Charging Scheme?
Not on the same chargers. The Workplace Charging Scheme closes on 31 March 2027 and can suit staff or small van charging now. We’ll tell you which route fits.
Does it cover a bigger electricity supply?
No. Grid connection costs are excluded, so we design around your existing supply first and flag early if an upgrade is needed.
What if we only have one or two electric vans?
You can still apply. We’ll tell you honestly whether the Depot Charging Scheme or a simpler install makes more sense.
Do you cover my area?
Yes. We install nationwide from our London and Wolverhampton offices and depots.
Scheme status checked 12 November 2026: window 2 opened 11 November 2026 and closes at midday on 26 February 2027, grant rate 60%.
